SC200/200 Construction Hoist – Indonesia Project

Category:Case StudiesPublish Time:2026-02-02 16:12:44Page Views:662

Project Story (August 2019)

In August 2019, a construction company in Jakarta began work on a 28-story residential apartment project in the city center. Due to the dense urban environment and limited material storage space on-site, the contractor needed an efficient vertical transportation solution to move workers and construction materials safely and continuously.

After evaluating several suppliers, the client selected the SC200/200 construction hoist provided by Henan Haolu Machinery Equipment Co., Ltd. The hoist system was configured with dual cages to improve transportation efficiency during peak construction hours.

Our engineers assisted the client with foundation preparation, mast installation, and electrical commissioning. Despite frequent heavy rainfall during the installation period, the hoist was fully operational within 18 days.

Detailed Project Outcome

1. Improved Vertical Transportation Efficiency

The SC200/200 construction hoist significantly improved material transportation efficiency on-site.

During peak construction stages:

  • The hoist operated an average of 11 hours per day;
  • More than 180 worker trips were completed daily;
  • Daily material transportation exceeded 120 tons.

The dual-cage configuration reduced waiting time for workers and improved overall workflow coordination.

2. Stable Operation in Tropical Climate

Jakarta’s humid climate and frequent rainfall created challenging operating conditions.

The client reported that:

  • The hoist maintained stable lifting speed during rainy weather;
  • The electrical control system operated reliably under high humidity;
  • The safety braking system responded accurately during continuous operation;
  • The mast structure remained stable even under heavy daily usage.
    The construction team was able to maintain its planned schedule throughout the rainy season.

3. Enhanced Site Safety

Before using the construction hoist, workers relied heavily on temporary lifting equipment and manual transportation.

After installation of the SC200/200:

  • Worker transportation became more organized;
  • Material lifting risks were significantly reduced;
  • On-site labor intensity decreased;
  • Daily transportation efficiency improved by approximately 35%.
    Project supervisors noted that the hoist greatly improved both safety management and construction organization.

4. Reduced Downtime & Maintenance

The hoist system maintained stable operation throughout the project period:

  • Drive motors operated smoothly under full load conditions;
  • Rack and pinion transmission showed minimal wear;
  • Safety limit switches functioned reliably;
  • Routine maintenance was simple and efficient.

The client estimated that equipment downtime was reduced by nearly 40% compared with their previous lifting equipment.

Simplified Equipment Table

CategoryEquipmentQuantity
Construction HoistSC200/200 Dual Cage1 set
Drive Motor3×11 kW2 sets
Mast Section650×650×1508 mm45 pcs
Safety DeviceAnti-falling Safety System2 sets
Electrical Control SystemPLC Control Cabinet1 set
Cage Size3×1.5×2.2 m2 cages

Client Feedback

“The SC200/200 construction hoist greatly improved transportation efficiency on our high-rise project. Even during the rainy season, the equipment operated reliably and safely. Henan Haolu Machinery Equipment Co., Ltd. provided professional technical support throughout the installation process.”